Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13638375

- Product Categories
- Friendly Links
- home > Supply > Equipment removal costs | Shandong Lu lifting (certified) | Sunshine handling equipment
Information Name: | Equipment removal costs | Shandong Lu lifting (certified) | Sunshine handling equipment |
Published: | 2015-07-14 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | All kinds of cranes, a variety of simple lifting, rope, twine and other inspections and tests, carry small devices, refer to the information in Appendix. * Lifting, handling Work on all major items of 669 experienced person shall be responsible for leadership, participate in the work program should be familiar with lifting handling and safety measures. When lifting handling only commanded by a person handling equipment prices, commanding officers should be made by the professional and technical training certification officer. Article 670 in case of fog, poor lighting, commanding officers see each workplace or when lifting the driver can not see the command staff are not allowed to carry out lifting work. Safety Precautions lifting and hoisting machinery: 1, driver and commanding officers to go through professional training, and passing the examination after the training department to start to work, the command staff before the job to be familiar with and understand the performance of the locomotive's weight lifting scene surrounding environment. 2, in front of the leg support lifting operations must be firmly established, stable and does not tilt. Start lifting before hoisting personnel must scrutinize whether the firm is hanging objects, heavy equipment handling, no person shall be allowed with lifting equipment lift. 3, the crane operator when operating, the spirit to concentrate, to obey the command of the command staff. 4, within the swing radius of the crane in use strictly prohibited. 5. Set lifting operations when the warning area to hang warning signs, non-operating personnel may not enter. 6, is prohibited in the wind speed more than six or windy, foggy weather hoisting operations. 7, in the process, such as lifting interruptions must take security measures. 8, the night lifting operations must have adequate lighting. 9, hoisting workers to move and work in high-altitude sunshine handling equipment must be fastened seat belt, under the dedicated workers on ladders, platforms scaffold boards laying tight. 10, workers always check whether the hopper hanging open welding, whether the broken wire rope, broken shares, if in hidden immediately stop construction after renovation work. Equipment removal costs | Shandong Lu lifting (certified) | handling equipment provided by the Shandong Rizhao in Shandong mechanical equipment installation Limited. Shandong Lu Machinery Installation Co., Ltd. (www.sdlzqz.com) Shandong Jinan, industrial maintenance, installation of leaders, over the years, the company implement the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Lifting leadership in Shandong Lu in the staff warmly welcome all inquiries negotiations to create Shandong Lu lifting a better future. |
Admin>>>
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility