Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13638375

- Product Categories
- Friendly Links
- home > Supply > Lifting handling equipment, Shandong Lu lifting (online consultation), Linzi handling equipment
Information Name: | Lifting handling equipment, Shandong Lu lifting (online consultation), Linzi handling equipment |
Published: | 2015-06-24 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Before the demolition, in conjunction with the manufacturers and the owners must first cut off the power and remove the device. Water, gas supply and other parts and workshop power contacts. 2.3 emptying oil, coolant, cleaning fluid. 2.4 dismantling should avoid destructive disassembly (such as torch cutting, etc.), as must be carried out through the owner's representative and the engineer in charge. 2.5 all the wires, cables are not allowed to cut, removed lint Linzi handling equipment should have a label, no label for some thread, and then remove the first supplement, line number are not allowed to lose mechanical handling equipment, before stitches to conducted three controls (internal line number. Terminal plate number, external line number) after the confirmation handling equipment lifting, removable side, or to adjust the line numbers. Construction, Party B must live embedded parts, elevation, etc. are reviewed, such as undesirable heavy equipment handling, must be subject to change visa Party. 6, non-standard pieces of processing or on-site production quality, quality of purchased parts confirmation shall be Party approved. Can be carried out after 7, the second filling of concrete curing strength must reach 90% of secondary alignment; after the second alignment smooth completion basis; 8, universal mounting accuracy of the contents according to the relevant technical standards or demolition equipment original precision execution . 10, lubrication piping installation shall be carried out before drying process, and can not be mixed with water and other impurities; 11, after the test is completed, the entire tube section, pneumatic elements should be subject to venting and drying treatment, in order to avoid the production of piping and components to rust and blockage; lifting handling equipment, Shandong Lu lifting (online consultation), Linzi handling equipment supplied by Shandong Zhonglu mechanical equipment installation Limited. Shandong Lu Machinery Installation Co., Ltd. (www.sdlzqz.com) Shandong Jinan, industrial maintenance, installation of leaders, over the years, the company implement the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Lifting leadership in Shandong Lu in the staff warmly welcome all inquiries negotiations to create Shandong Lu lifting a better future. |
Admin>>>
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility