Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13638375

- Product Categories
- Friendly Links
Information Name: | Machinery Handling | Linyi handling equipment | Lifting Shandong Lu |
Published: | 2015-06-24 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Construction, Party B must live embedded parts, elevation, etc. are reviewed, such as undesirable, it must be subject to change visa Party. 6, non-standard pieces of processing or on-site production quality, quality of purchased parts confirmation shall be Party approved. Can be carried out after 7, the second filling of concrete curing strength must reach 90% of secondary alignment; after the second alignment smooth completion basis; 8, universal mounting accuracy of the contents according to the relevant technical standards or demolition equipment original precision execution . 10, lubrication pipes must be installed before the drying process ordinary handling equipment, shall not be mixed impurities and moisture and the like; 11, after the test is completed, the entire tube section, pneumatic elements should be subject to venting, drying machinery and equipment handling, in order to avoid production time piping and components to rust and blockage; according to the general principles of the demolition, combined with the actual situation of each device to determine the number of major disassembly member, each member of the dimensions and estimate the weight, should be drawn out before the demolition measure relevant dimensions of each part, draw the necessary piping system diagram lifting handling equipment, protective measures for running rails, power head and various sensing element. Demolition should be removed after the demolition of the branch duct Linyi handling equipment, final stand, the disintegration of pieces of equipment in other dimensions within the pipeline is no longer disassemble, when the device is connected by a hose, connect the tube open, the hose banding to the device, the demolition should pay special attention to the following: machinery and equipment handling | Linyi handling equipment | Shandong Lu in Shandong Lu lifting by mechanical equipment installation Limited. Shandong Lu Machinery Installation Co., Ltd. (www.sdlzqz.com) strong, credible, in Jinan, Shandong's industrial maintenance, installation and other industries has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Shandong Lu lifting into the brilliant and you work for a better future! |
Admin>>>
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility