Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13638375

- Product Categories
- Friendly Links
- home > Supply > Lu experience (Figure) | equipment installation engineering | High-tech Zone Installation
Information Name: | Lu experience (Figure) | equipment installation engineering | High-tech Zone Installation |
Published: | 2015-05-29 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Installation of equipment: safety equipment, based on the large amount of equipment in industrial installation works, mainly in the lift operating requirements. A large weight, very difficult bulky industrial equipment installation, installation location and lifting equipment, and consumer costs. The disintegration of the equipment should be placed in the first device. Testing and adjustment accuracy and alignment accuracy testing is a key mechanical equipment installation engineering. It is an important indicator of the quality of the installation work. It includes almost all of the positional accuracy and shape accuracy of the project, error analysis, dimension chain theory and precision measurement technology. Sophisticated detection equipment, the relative position error between the components, such as vertical, parallel installation works, concentricity error. Adjustment is based on the installation of the technical requirements of the device (defined specifications or technical documentation supplied with the machine) and sophisticated detection result, adjusting the equipment itself and the geographic conditions, such as installation of horizontal, vertical, parallel and tilt. Steel columns Offset: 1, construction preparation (1) the preparation of steel erection construction organization. Its contents include: calculation of the number of steel members and connections, select hoisting machinery, determine the water program, to determine the lifting method to develop the schedule, determine labor organization, planning member yard, to determine the quality standards and safety measures. (2) the basis of test preparation and steel components. Its contents include: the axis error measure, preparing the foundation bearing surface, the bearing surface and the bearing surface elevation of the level of testing, measuring bolt position and an extended length of the bearing surface and the like. Foundation bearing surface and bolt bearing tolerances compliance. Before lifting should be based on "steel construction and acceptance" (GB50205-2001) requirements of confidentiality installation, carefully examine the shape and geometry of the steel members, if the deviation before lifting should try to eliminate. (3) if necessary, checking the stability of hoisting steel members, checking formulas please check the relevant information. Lu experience (Figure) | equipment installation engineering | High-tech Zone installation provided by Shandong Zhonglu mechanical equipment installation Limited. Shandong Shandong Machinery Installation Co., Ltd. (www.sdlzqz.com) adhere to the "people-oriented" business philosophy, with a professional staff, and strive to provide the best products and services to contribute to society, and welcome new and old customers to visit us sincere cooperation for a better future. Shandong Lu lifting - your trusted friend Address: Jinan High-tech Zone Industrial Road 36, Contact: Manager Zhao. |
Admin>>>
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility