Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13638375

- Product Categories
- Friendly Links
Information Name: | Clean room equipment handling, handling equipment Liaocheng, Shandong Lu lifting |
Published: | 2015-05-22 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Disintegration depending on the circumstances and transportation requirements of various process equipment to determine whether the disintegration of the disintegration process should note the following: A. draw the necessary process equipment layout plan. B. Removing the process to make a detailed inspection and disassembly disintegration record. 1.3.7 Removing the electrical system of each processing line (equipment) Electrical systems dismantled to note the following: A. Before demolition, to be familiar with the relative position of each laboratory equipment handling electrical equipment, cable routing and understand the significance of their number. B. Draw the mutual position of each electrical devices, before removing the bridge, the first to draw a perspective view, and then install the numbers marked on the map, and then install this number marked on the cable tray, mark complete, removable side . C. For the convenience of safe and reliable mechanical and electrical disassembly, cable box location from the disintegration conducted by each power head. First press the corresponding terminal line number, all compiled on the front D. REMOVE, carefully check the correct removable rear. E. For the ultra terminal box position, the column should be removed, fixed in the corresponding position, but can not force the cable. Since the dismantling of equipment are generally old equipment before disassembly, we deal with the appearance of each device and the relative position of mechanical and electrical equipment handling, installation precision handling equipment, process conditions make checks, and in conjunction with the owners and the technical staff to fill out the form countersigned no clean rooms handling equipment, hand over the acceptance as a future basis for ongoing individual equipment, we can take its workpiece as debugging samples to make standard processing accuracy after installation, for some control of the more advanced equipment, For example, computer-controlled equipment, consider from discontinued dismantling, packaging, transportation, re-installation, commissioning and operation of such a long cycle, the machine program loss problem, should be promptly backed up. Clean room equipment handling, handling equipment Liaocheng, Shandong Lu in Shandong Lu lifting by mechanical equipment installation Limited. Clean room equipment handling, handling equipment Liaocheng, Shandong Lu in Shandong Zhonglu Lifting Equipment Installation Co., Ltd. (www.sdlzqz.com) this year introduced a new upgrade, the above picture is for reference only, please call this page or image on the telephone, to obtain the latest information, Contact: Manager Zhao. |
Admin>>>
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility