Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13638375

- Product Categories
- Friendly Links
- home > Supply > Heavy lifting equipment | Lifting technology leader Lu (certified) | Laiwu lifting equipment
Information Name: | Heavy lifting equipment | Lifting technology leader Lu (certified) | Laiwu lifting equipment |
Published: | 2015-04-09 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Electrical power system equipment is referred to specialized lifting equipment for generators, transformers, power lines, circuit breakers and other equipment, electrical equipment which is installed with a certain degree of risk. Therefore, electrical equipment installation, we should pay attention to the following electrical equipment Safety Precautions Installation: 1, the metal casing of electrical equipment must be grounded or connected to ground zero to do the same equipment and the same supply network does not allow access to zero and some others connected to ground zero 2, the power transmission system and high... various types of low-voltage switch debugging should be removed or the relevant switch handle lock, hanging badges, to prevent accidental closing. 3, more than one distribution panel (box) installed side by side, the fingers can not put two plates (boxes) of occupies a position, do not touch the screw and screw connections. 4, when installing high-pressure oil switch, automatic air switches and other equipment to return spring switch should switch to the off position. 5, the metal casing pressure test device shall grounded by test equipment or cable ends, such as lifting equipment not in the same place, the other side should be guarded or locked. of instruments, such as checking the wiring is correct, after the evacuation of sophisticated lifting equipment before boosting. 6, electrical equipment or materials for non-impact test, boost or buck, should be carried out slowly. reason to suspend or end the pressure test, you should cut off the power supply, safe discharge, and will boost the high side shorted to ground equipment. 7, electrical equipment used in the open air, the performance should be good rain or rain reliable facilities. distribution box must be strong, complete and rigorous use of the distribution box placed debris is prohibited. 8, current transformer prohibit open when a short circuit and voltage transformer is prohibited to boost mode. 9, electrical equipment all fuses (kg) should be rated for its load capacity to adapt. prohibit the use of other metal wire instead of a fuse (piece). 10, handling distribution cabinet , there should be someone directing, acting in unison. 11, tick tank, when holes, must wear protective glasses, a hammer handle not loose. chisel not curl, crack. called the wall, when the floor through the eye, behind the walls of large equipment lifting, not someone close to the floor below. hoisting machinery management, mainly refers to two aspects of the manufacture and use. Crane factory have some technical capacity to ensure that product technology is not lower than the level of industry-wide technical conditions; homemade and transformation cranes, or sentinel plants produce cranes, crane must have the equivalent skill level sentinel plants, and have design documents or rehabilitation programs, before production after the approval of the relevant departments. Product quality is unstable, the factory's products often cause accidents factory, authorities should require rectification, serious problems should be ordered to stop. Heavy lifting equipment | Lifting technology leader Lu (certified) | Laiwu lifting equipment provided by Shandong Lu mechanical equipment installation Limited. Shandong Lu Machinery Installation Co., Ltd. (www.sdlzqz.com) Shandong Jinan, industrial maintenance, installation of leaders, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Lifting leadership in Shandong Lu staff warmly welcome all inquiries negotiations to create Shandong Lu lifting a better future. |
Admin>>>
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility