Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13638375

- Product Categories
- Friendly Links
- home > Supply > Coal washing equipment installation | Shandong Lu first service (certified) | handling equipment in place
Coal washing equipment installation | Shandong Lu first service (certified) | handling equipment in place
Information Name: | Coal washing equipment installation | Shandong Lu first service (certified) | handling equipment in place |
Published: | 2015-03-03 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Warm Wei equipment installation - boiler and ancillary equipment installed in boiler operation leveling provisions: 1. boiler vertical leveling: (1) on the surface of the grate tandem Check furnace foot level (level-foot length of not less than 600mm) longitudinal horizontal row of the plane. Checkpoint least two grates around. Requirements should be horizontal or vertical surface grate grate furnace rear slope surface slightly. Elevation deviation + 5mm. (2) When the boiler is not usually the longitudinal direction, the low end of the jack can be used from the top, in the boiler of the stent underlying steel sheet with proper thickness, so that the level of the boiler to meet the requirements. Horn spacing is generally 500 ~ 1000mm 2. Transverse leveling boiler: (1) horizontal ruler (length not less than 600mm) on the surface of the grate horizontal installation, horizontal level of the grate surface inspection, inspection a minimum of two points before the grate, grate the lateral inclination is not greater than 5mm (lateral tilt grate grate over the General Assembly led to deviation). (2) when the basic installation testing methods usually grate laterally, with a jack stand to the side while jacking boiler electrical equipment installed in the proper thickness of the stent underlying steel horn spacing is generally 500 ~ 1000mm. 1. If there is suspicion of industrial equipment installation, use or Hammer hit ball marks on the basis of the strength of the method retest the equipment based on the basis of the appearance of strength 2. Check: The main basis to see whether the cellular surface, Pock 3. On the basis of quality defects such as the location of the measurement geometry check: Check the main items are the basis of the coordinate position, different planes of elevation, planar dimensions, bosses plane Dimensions air-conditioning installation, pocket size, degree horizontal plane, based on the degree of plumb, level and anchor bolts embedded center distance, center bolt hole location embedded deep vertical extent of producing primary cell wall, bolt anchor plates embedded activity elevation, central location, slotted anchor plate and horizontal extent of the threaded anchor plate washing equipment installation |. Shandong Lu first service (certified) | handling equipment in place by Shandong Lu mechanical equipment installation Limited. Shandong Lu Machinery Installation Co., Ltd. (www.sdlzqz.com) Shandong Jinan, industrial maintenance, installation of leaders, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Lifting leadership in Shandong Lu staff warmly welcome all inquiries negotiations to create Shandong Lu lifting a better future. |
Admin>>>
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility