Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13638375

- Product Categories
- Friendly Links
Information Name: | Medical Equipment Installation Equipment Installation _ _ Taian Lu-class service |
Published: | 2015-01-28 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | In some large equipment during transport, crane hoisting equipment handling process is inevitable and for hoisting equipment handling problems, we have the following requirements: First, the indigenous construction method using a rolling mobile handling equipment, roll bar thickness to be consistent, the annual discharge care should be longer than the width of 50cm, non-roll bar filled with gloves. handling car piping slope not greater than 20 °, the erection of the raceway to be smooth, solid, joints staggered, scrolling speed is not too fast, if necessary When to use the rope slip. Second, during the installation process, if problems should take timely measures to deal with and then continue lifting. Third, the large tower type derrick lifting equipment, hoist more than one joint operation, you must request the winch winch speed roughly the same, to ensure that each lifting point on the tower tends to force roughly evenly to avoid discontinuity tower uniform deformation. Fourth, when using rotary method or the method of lifting tower toppled tanks, installed at the bottom of the tower wrist hinge must resist lifting horizontal thrust generated during the installation capacity of power plant equipment, about the process of lifting the tower slipped the rope must be securely installed security equipment, turning in place during the height of the tower to slowly fall into the base, to avoid accidents and deformation. five on the frame body, or when installing the device, its strength and stability to achieve the requirements of the building installation conditions. After installation positioning requirements according to drawings or welded connections are tight, to meet the design After the required strength and stability have to decoupling, or to temporarily fixed-site investigation is the process of lifting the entire device is very critical part of installation, but also whether the key success factors. Only a good survey of the site to develop a detailed relocation plan, prepare for the lifting equipment. 1, the size of the venue (including the factory gate, plant height and live openness) decision out of the vehicle types. If the site does not meet the requirements of this job is to think about how to transform the site? 2, a measure of the ground can withstand this job the weight of the vehicle or equipment, if you can not afford the time to consider what measures to take to protect or enhance? 3, to consider the height of the foundation, which is the tool of choice and use of a larger quantity of 4, floor height directly affects the lifting machinery or Select the program. 5, leveraging point should be selected in a safe, solid foundation, such as concrete beams, columns or beams, columns, etc., can also be used or produced iron anchor code, etc. All stress points should in principle Through theoretical calculations to verify their safety. Through the site survey and exploration equipment obtained data or photographs, programs and budgets can be purchased to reduce errors, improve accuracy and feasibility of the program budget. The site survey is lifting equipment very necessary thing, to really find out and grasp the main points of the scene, in order to ensure safe operation, high quality and efficient medical equipment installation equipment installation _ _ Taian Lu-class service provided by Shandong Lu mechanical equipment installation Limited. Shandong Lu Machinery Installation Co., Ltd. (www.sdlzqz.com) strong, credible, in Jinan, Shandong industrial maintenance, installation and other industries has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Shandong Lu lifting and you work into the brilliant, for a better future! |
Admin>>>
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility