Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13638375

- Product Categories
- Friendly Links
- home > Supply > Printing equipment handling | Shandong Lu lifting (certified) | Linyi handling equipment
Information Name: | Printing equipment handling | Shandong Lu lifting (certified) | Linyi handling equipment |
Published: | 2015-01-26 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Precautions for safe use of lifting and hoisting machinery: a driver and commanding officers to go through professional training, after training and passing the examination department to start to work, commanding officer before the job to be familiar with and understand the performance of the locomotive's weight lifting site surroundings. 2, in front of the leg support lifting operations must be firmly established, stable and does not tilt. Start lifting before hoisting personnel must scrutinize whether the firm is hanging objects, no person shall be allowed with the hoisting equipment movements. 3, the crane operator when operating the machine handling equipment, transport equipment prices spirit to concentrate, to obey the command of the command staff. 4, within the swing radius of the crane in use is strictly prohibited to stand. 5, set the warning area to hang warning signs handling equipment, non-workers will not be admitted during lifting operations. 6, is prohibited at wind speeds above six or windy, foggy weather hoisting operations. 7, in the process, such as lifting interruptions must take security measures. 8, the night lifting operations must have adequate lighting. 9, lifting operations personnel in high altitude moving and jobs must be fastened seat belt, consists of dedicated workers on ladders, work platforms scaffold boards laying tight. 10, workers always check whether the ash bucket hanging open solder printing equipment handling, whether the broken wire rope, off shares phenomenon, if risks to immediately stop the construction, operation after rectification. Relocation of equipment Note: 1, choose a regular handling equipment services company. 2. Remember that you must have the device relocation company survey the construction site to prevent future trouble. 3, signed a construction contract, to ensure their interests are not damaged. 4, to determine the construction date of the signing of a valid contract. 5, on the need to remove the devices removed. Printing equipment handling | Shandong Lu lifting (certified) | Linyi handling equipment provided by Shandong Lu mechanical equipment installation Limited. Shandong Lu Machinery Installation Co., Ltd. (www.sdlzqz.com) Shandong Jinan, industrial maintenance, installation of leaders, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Lifting leadership in Shandong Lu staff warmly welcome all inquiries negotiations to create Shandong Lu lifting a better future. |
Admin>>>
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility