Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13638375

- Product Categories
- Friendly Links
- home > Supply > Stage equipment installation, equipment installation Binzhou, Shandong lifting of choice
Information Name: | Stage equipment installation, equipment installation Binzhou, Shandong lifting of choice |
Published: | 2015-01-17 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Intelligent Building Input Devices installation requirements: 1, the installation location should be able to properly reflect the position of performance, ease of debugging and maintenance of places, different types of sensors should design and product requirements and the actual situation to determine its location; 2, pipe type temperature sensor, steam pressure sensors, flow switches, pipes should not be installed in the pipe flow meter and the edge of the opening seam welding; 3, duct type, humidity sensors, indoor temperature sensors, air vapor pressure sensor, air quality sensor should avoid steam vent opening and the outlet; 4, tube-type temperature sensor, pressure sensor pipes, steam pressure sensors, flow switch should be installed at the same time in the process piping installation; 5, duct pressure, temperature, humidity, air quality, air velocity, pressure switch should be installed in the duct insulation is finished. 6, duct pressure, temperature, humidity, air quality, air velocity, pressure switch should be installed in the duct insulation is finished. Basic installation testing method 1. If you have doubts stage equipment installation, available Hammer or ball hit marks on the basis of the strength of the method retest 2. On the basis of visual inspection of the equipment based on the intensity: The main basis of the surface look quality defects or without cellular, Pock, etc. 3. basic position, geometry measurement checks: Check the main project has based coordinates, elevation equipment to install a different plane, the plane dimensions lightning equipment installation, bosses plane dimensions, pocket size, the degree of horizontal plane, based on the degree of plumb, level and anchor bolts embedded center distance, center bolt hole location embedded deep vertical extent of producing primary cell wall, pre Activities bolt anchor plates buried elevation, central location, slotted anchor plate and horizontal extent of the threaded anchor plate. stage equipment installation, equipment installation Binzhou, Shandong preferred by Shandong Lu Lifting Equipment Installation Co., Ltd. . Shandong Lu Machinery Installation Co., Ltd. (www.sdlzqz.com) strong, credible, in Jinan, Shandong industrial maintenance, installation and other industries has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Shandong Lu lifting and you work into the brilliant, for a better future! |
Admin>>>
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility