Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13638375

- Product Categories
- Friendly Links
- home > Supply > Equipment installation handling, Shandong Lu mechanical (certified), Tai'an equipment installation
Information Name: | Equipment installation handling, Shandong Lu mechanical (certified), Tai'an equipment installation |
Published: | 2015-01-13 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Hydropower installation and construction organizations planning and preparation of content requirements. Pipeline installation and construction organization plan is a programmatic document guiding the construction and installation, during construction foreman want to arrange the organization in accordance with the requirements of the construction organization plan. But now the real construction design by guiding the construction of relatively rare equipment installation removed, a common problem is the construction design of targeted, operability is not strong. Reminded to do to guide the construction, "construction design" content preparation to reach at least the following requirements: 1. The installation of water profiles can not be simply copied the design of lifting equipment installation instructions, and should form the building, the height of the structure installation practices, including walls, floors, especially between the bathroom and kitchen floors and walls practice vividly described, as well as wall insulation, partition walls practice, in addition to introducing the division of engineering contracting and construction features of the range. 2. The layout design must be based on the current effective construction contract (agreement), construction drawings, atlas, construction inspection standards, inspection and assessment standards, local regulations, labor quota. 3. The installation of water main construction preparations include technical preparation, physical preparation, construction site preparation. Technical preparation reflects the advanced technology, including the preparation of construction drawings and triage design, technical tests. When lifting the structure should be set up in fall protection measures lifting height operation, should be required to set up security measures to prevent falls. When lifting structure can be set between the mobile section Anquan Ping network security equipment installed between the lifting section with flat screen can be shifted to the next section between a safe height between workers protection section. High job specification states: "Before hoisting roof trusses, should be pre-hung in the bottom chord safety net, after lifting completed, the safety net is about to lay fixed." Equipment installation handling, Shandong Lu mechanical (certified), Tai'an equipment installation provided by Shandong Lu mechanical equipment installation Limited. Shandong Lu Machinery Installation Co., Ltd. (www.sdlzqz.com) Shandong Jinan, industrial maintenance, installation of leaders, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Shandong Lu mechanical leadership with the staff warmly welcome all inquiries negotiations to create Shandong Lu mechanical better future. |
Admin>>>
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility