Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13638375

- Product Categories
- Friendly Links
- home > Supply > _ Small lifting equipment installation company Shandong Lu (certified) _ Dongying equipment installation
_ Small lifting equipment installation company Shandong Lu (certified) _ Dongying equipment installation
Information Name: | _ Small lifting equipment installation company Shandong Lu (certified) _ Dongying equipment installation |
Published: | 2015-01-10 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Warm Wei equipment installation - boiler and ancillary equipment installed in boiler operation leveling provisions: 1. boiler vertical leveling: (1) on the surface of the grate tandem Check furnace foot level (level-foot length of not less than 600mm) longitudinal horizontal row of the plane. Checkpoint least two grates around. Requirements should be horizontal or vertical surface grate grate furnace rear slope surface slightly. Elevation deviation + 5mm. (2) When the boiler is not usually the longitudinal direction, the low end of the available jack jacking equipment fan installed in the boiler's scaffold to underlying steel sheet of suitable thickness, so that the level of the boiler to meet the requirements. Horn spacing is generally 500 ~ 1000mm 2. Transverse leveling boiler: (1) on the grate with the level of foot (length not less than 600mm) of horizontal surface, the lateral surface of the grate level degree examination, the checkpoint at least grate for around two lateral tilt grate no larger than 5mm (lateral tilt grate grate over the General Assembly led to deviation). (2) when the grate is not usually laterally, with a jack while the boiler from the top side of the bracket, the bracket spacing Xiadian appropriate thickness steel plate, horn is generally 500 ~ 1000mm electrical engineering installation: 1, household settings The distribution box size, must actually be in accordance with the required open space; total household must be set to open (the poles) + leakage protection (the desired position for four chip count, circuit breakers open space for qualified products), in strict accordance with the brightest figure divided open space and wiring, and marked each open space using the old road. Distribution box installation must have a reliable ground connection; 2, with the landlord to determine the switches, sockets brand, verify doorbell, door light power, proofreading drawings are consistent with site installation, does not match the customer's consent when the machine should be adjusted should pay signature; 3, electrical wiring are used CSI BV single strand copper purification equipment installation, wear dark buried PVC hollow floor, except cast roof) for smooth vertical and horizontal direction, walk along the flat top corner, but there is no ceiling overcast angle 80mm cream line time to go Ф20mm, Ф15mm each one, in strict accordance with the wiring diagram (lighting 1.5mm2, socket 2.5mm2, part of electrical power with 4mm2,) shall not have internal fittings and kinks, both with the new line. Prohibit direct wire buried ash layer (using the yellow wax sets of lines in case of mud when concrete); 4, the inner tube of the total cross-sectional area of ??the wire must not exceed 40% of the cross-sectional area of ??the pipe diameter. Some go the same way with the same lighting can penetrate inside a tube, but the total number of wires inside the tube and not more than 6; 5, telephone lines, TV cable, computer cable into the family line shall not be moved or closed NC lifting equipment installation prohibited weak line and wires installed in the same duct (including through the switches, sockets and other cassette with cassette), both straight line from the corner of the ground; 6, non-random changes in gas pipes and meter location, conduit and gas tube spacing not less than the same plane 100mm, different planes of not less than 50mm, electrical switch and outlet gas pipe spacing of not less than 150mm 7, the line inside the box reserved for small length of wire lifting equipment installation _ Shandong Lu in the company (certified) _ Dongying equipment installation installed by Shandong Machinery Co., Ltd. Lu provided. Shandong Lu Machinery Installation Co., Ltd. (www.sdlzqz.com) Shandong Jinan, industrial maintenance, installation of leaders, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Shandong Lu mechanical leadership with the staff warmly welcome all inquiries negotiations to create Shandong Lu mechanical better future. |
Admin>>>
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility