Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13638375

- Product Categories
- Friendly Links
- home > Supply > Monitoring equipment installation | Qingdao equipment installation | Shandong Lu preferred
Information Name: | Monitoring equipment installation | Qingdao equipment installation | Shandong Lu preferred |
Published: | 2015-01-09 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Warm Wei equipment installation - boiler and ancillary equipment installed in boiler operation leveling provisions: 1. boiler vertical leveling: (1) on the surface of the grate tandem Check furnace foot level (level-foot length of not less than 600mm) longitudinal horizontal row of the plane. Checkpoint least two grates around. Requirements should be horizontal or vertical surface grate grate furnace rear slope surface slightly. Elevation deviation + 5mm. (2) When the boiler is not usually the longitudinal direction, the low end of the jack can be used from the top, in the boiler of the stent underlying steel sheet with proper thickness, so that the level of the boiler to meet the requirements. Horn spacing is generally 500 ~ 1000mm 2. Transverse leveling boiler: (1) on the grate with the level of foot (length not less than 600mm) of horizontal surface plant equipment installation, horizontal level degree examination grate surface, Checkpoints around grate least two lateral tilt grate no larger than 5mm (lateral tilt grate grate over the General Assembly led to deviation). (2) when the grate is not usually laterally, with a jack while the boiler from the top side of the bracket, the bracket to the plate sugar underlying installation of appropriate thickness, horn spacing is generally 500 ~ 1000mm steel column offset: 1, construction preparation (1) preparation of steel erection construction organization. Its contents include: calculating the number of steel members and connections, select hoisting machinery, determine water program, to determine the lifting method, schedule planning, determine labor organization, planning component yard, to determine the quality standards and safety measures. (2) the basis of test preparation and steel components. Its contents include: the axis of measurement error, prepare the ground bearing surface, the bearing surface and bearing surface elevation and levelness of inspection, measuring bolt position and an extended length of the bearing surface and so on. Foundation bearing surface, bearing and bolt the tolerances comply with the relevant regulations. Before lifting equipment should be installed in accordance with the water, "steel construction and acceptance" (GB50205-2001) requirements, carefully examine the shape and geometry of the steel components, if any deviation, before lifting should try to eliminate. (3) if necessary, checking the stability of hoisting steel members, checking formulas please check the relevant information. Monitoring equipment installation | Qingdao equipment installation | Shandong Lu in Shandong Lu preferred by mechanical equipment installation Limited. Shandong Lu Machinery Installation Co., Ltd. (www.sdlzqz.com) strong, credible, in Jinan, Shandong industrial maintenance, installation and other industries has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Shandong Lu machinery and you work into the brilliant, for a better future! |
Admin>>>
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility