Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13638375

- Product Categories
- Friendly Links
- home > Supply > Small lifting equipment, Shandong Lu mechanical (certified), Laiwu lifting equipment
Information Name: | Small lifting equipment, Shandong Lu mechanical (certified), Laiwu lifting equipment |
Published: | 2015-01-08 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Crane driver responsibilities and requirements: (1) the driver must obey the command staff, when the command signal is unknown, the driver should issue a "repeat" signal asking, after commanding a clear intent before driving. (2) The driver must be familiar with common hand signals and command signals related to various standards and in close cooperation with the commanding officers. (3) When the signal is in violation of the provisions of the standard issued by the commanding officers lifting equipment, the driver has the right to refuse to perform. (4) driver before driving must-ringing warning, if necessary, should be lifted in-ringing, ground personnel notify the threat of withdrawal of the load. (5) in the lifting process, the driver of any person issued the "emergency stop" signal should be obeyed. When the relocation of machinery and equipment, in order to protect the system after the relocation to normal operation and routine operation and maintenance, we generally require the owner to coordinate the implementation of the environment and conditions needed after removal, the specific content and requirements are as follows: First, you must provide a path from the room XX XX gigabit network monitoring center to link two lanes, on-site installation of equipment relocation detailed position, need to meet the requirements of industrial equipment, lifting equipment installation, clean and clean. Third, power supply equipment lifting handling equipment after the removal, UPS power supply. site environment UPS need to meet to take power, access to the relocation of equipment; UPS power supply needs time to reach the owners to use four, the new location after the removal of the switch installed, you need to put a small cabinet lifting equipment, Shandong Lu mechanical (certified), Laiwu equipment. Lifting provided by Shandong Lu mechanical equipment installation Limited. Shandong Lu Machinery Installation Co., Ltd. (www.sdlzqz.com) Shandong Jinan, industrial maintenance, installation of leaders, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Shandong Lu mechanical leadership with the staff warmly welcome all inquiries negotiations to create Shandong Lu mechanical better future. |
Admin>>>
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 17815 visitor
Copyright © GuangDong ICP No. 10089450, Lu in Shandong Machinery Installation Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility